Workpackages - Liaison Groups
In order to achieve topical coordination within the projects of the cluster, 6 liaison groups (LG) have been formed on priority issues. Regular exchanges and meetings are organised by the liaison group leaders in order to ensure sound cooperation between the projects. Public events will be also programmed to enhance the communication with external experts.
Fouling
- Better fundamental understanding of membrane fouling in MBR
- Identification of design and optimal operation conditions to reduce fouling
- Fouling control through dosing of chemical additives
- On-line monitoring of fouling substances or sludge fouling propency
LG-Leader: C. Cabassud (INSA)
(
corinne.cabassud(at)insa-toulouse.fr)
Cleaning
- Identify optimal mechanical or chemical cleaning conditions depending on module and membrane type
- Investigation on membrane alteration and ageing through cleaning
- Alternatives cleaning strategies and protocols
LG-Leader: T. Wintgens (RWTH)
(
wintgens(at)ivt.rwth-aachen.de)
Filtration system
- Development and assessment of new MBR filtration systems
- Optimisation of module / aerator / reactor design
- Investigation on causes of membrane and aerator clogging
- Better understanding of hydraulic in module and filtration reactor
- Optimisation of aeration / filtration conditions to reduce fouling and clogging
LG-Leader: C Brepols (ERFT)
(
christoph.brepols(at)erftverband.de)
Process configuration
- Identification of appropriate configuration for advanced nutrients removal
- Impact of hydraulic residence time distribution on filtration and treatment performances
- Optimised design and operation strategy to cope with peak flows
- Position of submerged filtration module: inside or outside biological reactor?
- Design of MBR plants with our without primary sedimentation?
LG-Leader: G. Guglielmi (UNITN)
(
giuseppe.guglielmi(at)ing.unitn.it)
Modelling (biology, filtration, fouling)
Implementation of specific computer modelling tools and combinations:
- Dynamic ASM-models for plant desig and optimised control
- CFD-models to study the flow pattern throughout the entire plant or in the filtration reactor
- Modelling of filtration and fouling mechanisms
- Modelling of sludge production
LG-Leader: S. Judd (CRAN)
(
s.j.judd(at)cranfield.ac.uk)
Plant retrofitting
- Economics of partial or total plant retrofitting with MBR
- Strategies of design and control of dual MBR-CAS plants
- Turn-key MBR filtration systems for modular update of existing plants
- Case-studies with full-scale examples
LG-Leader: A. van Nieuwenhuijzen (TUD)
(
a.vnieuwenhuijzen(at)witteveenbos.nl)